Work packages

The development of MicroChip4Age is structured into work packages (WPs) that organize the different phases and aspects of the project. Each package brings together specific and complementary tasks, covering everything from prototype design to real-world testing, including safeguarding project outcomes, social and technical evaluation, and overall project management.

This structure ensures a coordinated, multidisciplinary, and results-oriented approach, with a clear focus on generating both technological and social impact."

WP1A:
  1. WP1A.T1: Definition of prototype requirements
  2. WP1A.T2: Selection of manufacturer, design, and prototype fabrication.
  3. WP1A.T3: Adaptation to the rest of the components
  4. WP1A.T4: Deployment, testing, and validation in the Smart Lab
WP1B:
  1. WP1B.T1:Recruitment of participants and pre/post evaluation
  2. WP1B.T2: Training of participants
  3. WP1B.T3: Deployment and maintenance of the pilot in the homes of the participant group
WP2:
  1. WP2.T1: Protection of industrial/intellectual property
  2. WP2.T2: Study of ethical and legal regulations
WP3:
  1. WP3.T1: Social study
  2. WP3.T2: Technical study
  3. WP3.T3: Strategic study
WP4:
  1. WP4.T1: General project coordination, administrative and financial
  2. WP4.T2: Dissemination and communication
  3. WP4.T3: Generation of documentation and reports